{"id":104058,"date":"2026-06-05T10:02:20","date_gmt":"2026-06-05T09:02:20","guid":{"rendered":"https:\/\/cleanenergypipeline.com\/?p=104058"},"modified":"2026-06-05T10:02:21","modified_gmt":"2026-06-05T09:02:21","slug":"greenfield-secures-planning-approval-for-italian-battery-storage-portfolio","status":"publish","type":"post","link":"https:\/\/cleanenergypipeline.com\/news\/greenfield-secures-planning-approval-for-italian-battery-storage-portfolio\/","title":{"rendered":"Greenfield secures planning approval for Italian battery storage portfolio"},"content":{"rendered":"\n<p>Greenfield has secured planning approval for two battery energy storage projects in Emilia-Romagna, Italy.<\/p>\n\n\n\n<p>The Emilia-Romagna 1 and Emilia-Romagna 2 projects will each have a capacity of 50 MW and four hours of storage duration, representing a combined capacity of 100 MW \/ 400 MWh.<\/p>\n\n\n\n<p>Both projects will connect to the Terna transmission network and are located approximately 500 metres from the high-voltage substation.<\/p>\n\n\n\n<p>Greenfield said the projects progressed from grid connection through development and planning approval in under 15 months.<\/p>\n\n\n\n<p>The projects will also provide agreed economic contributions to the local municipality.<\/p>\n\n\n\n<h2>BESS pair<\/h2>\n\n\n\n<p>\u201cAs battery storage deployment continues to accelerate across Europe, strategically located infrastructure will play a critical role in supporting grid stability, renewable integration and long-term energy security,\u201d said Fabio Spucches, CEO of Greenfield. <\/p>\n\n\n\n<p>\u201cEmilia Romagna 1 &amp; 2 demonstrate Greenfield\u2019s ability to deliver high-quality energy infrastructure efficiently and responsibly within rapidly evolving energy markets.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Greenfield has secured planning approval for two battery energy storage projects in Emilia-Romagna, Italy.<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"featured":true,"free":false,"countries":["35"],"regions":["3"],"organisations":["48332"],"projects":[],"sectors":["33"],"intelligences":["4","2","15"],"acf":{"image_hero":{"ID":102627,"id":102627,"title":"mionjkffa","filename":"mionjkffa.png","filesize":3298410,"url":"https:\/\/cleanenergypipeline.com\/wp-content\/uploads\/2026\/03\/mionjkffa.png","link":"https:\/\/cleanenergypipeline.com\/news\/live-demo-uk-battery-energy-storage-projects\/attachment\/mionjkffa-2\/","alt":"","author":"4","description":"","caption":"","name":"mionjkffa-2","status":"inherit","uploaded_to":102626,"date":"2026-03-23 12:03:48","modified":"2026-03-23 12:03:48","menu_order":0,"mime_type":"image\/png","type":"image","subtype":"png","icon":"https:\/\/cleanenergypipeline.com\/wp-includes\/images\/media\/default.png","width":1536,"height":1024,"sizes":{"thumbnail":"https:\/\/cleanenergypipeline.com\/wp-content\/uploads\/2026\/03\/mionjkffa-150x150.png","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/cleanenergypipeline.com\/wp-content\/uploads\/2026\/03\/mionjkffa-300x200.png","medium-width":300,"medium-height":200,"medium_large":"https:\/\/cleanenergypipeline.com\/wp-content\/uploads\/2026\/03\/mionjkffa-768x512.png","medium_large-width":768,"medium_large-height":512,"large":"https:\/\/cleanenergypipeline.com\/wp-content\/uploads\/2026\/03\/mionjkffa-1024x683.png","large-width":1024,"large-height":683,"1536x1536":"https:\/\/cleanenergypipeline.com\/wp-content\/uploads\/2026\/03\/mionjkffa.png","1536x1536-width":1536,"1536x1536-height":1024,"2048x2048":"https:\/\/cleanenergypipeline.com\/wp-content\/uploads\/2026\/03\/mionjkffa.png","2048x2048-width":1536,"2048x2048-height":1024}}},"_links":{"self":[{"href":"https:\/\/cleanenergypipeline.com\/wp-json\/wp\/v2\/posts\/104058"}],"collection":[{"href":"https:\/\/cleanenergypipeline.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cleanenergypipeline.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cleanenergypipeline.com\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/cleanenergypipeline.com\/wp-json\/wp\/v2\/comments?post=104058"}],"version-history":[{"count":2,"href":"https:\/\/cleanenergypipeline.com\/wp-json\/wp\/v2\/posts\/104058\/revisions"}],"predecessor-version":[{"id":104060,"href":"https:\/\/cleanenergypipeline.com\/wp-json\/wp\/v2\/posts\/104058\/revisions\/104060"}],"wp:attachment":[{"href":"https:\/\/cleanenergypipeline.com\/wp-json\/wp\/v2\/media?parent=104058"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cleanenergypipeline.com\/wp-json\/wp\/v2\/categories?post=104058"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cleanenergypipeline.com\/wp-json\/wp\/v2\/tags?post=104058"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}